Inside Self-Storage is part of the Informa Markets Division of Informa PLC

This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.

It Takes a Baby Roughly 9 Months to Develop … See What Metro Storage Managed to Build in 8!

Video-It Takes a Baby Roughly 9 Months to Develop … See What Metro Storage Managed to Build in 8!

A self-storage facility isn’t built overnight. Of course not. It takes time, care and expertise to develop today’s striking modern structures. Exactly how long? That depends on the intricacy of the project, but Metro Storage managed to raise this three-story, 90,000-square-foot beauty in Wall Township, New Jersey, in about eight months. Watch the timelapse video from Bedrock Concrete Corp. to see it come to life. The company used drone footage to chronicle everything from site preparation to laying the foundation to steel installation. Another industry wonder is born!

Hide comments
account-default-image

Comments

  • Allowed HTML tags: <em> <strong> <blockquote> <br> <p>

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Publish