This site is operated by a business or businesses owned by Informa PLC and all copyright resides with them. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 8860726.
As finding land in premium locations continues to be a challenge, many self-storage developers are turning to multi-story building to expand their options. Read about three primary tactics for building this product type and key design considerations.
Even when a desired parcel is zoned for self-storage, developers sometimes find themselves in a battle to build their project. Litigation along with a mixed-use approach helped LSC Development get approval in the Jefferson Park neighborhood of...
As large parcels in urban areas become scarce for self-storage development, little lots become more attractive. To make them work, however, you probably need to build multi-story. Consider this advice for overcoming common challenges and making...
With land being scarce, self-storage developers are often forced to build vertically if they want to take advantage of premium locations. Learn the important factors to consider when pursuing a multi-story project.
Update 12/20/19 – Connolly Bros. has completed construction on the Revere Beach Parkway self-storage project. The final design includes two freight elevators, dedicated sales/administration offices and covered customer-parking areas. The structure...
Update 6/20/19 – Jumbo Self Storage has selected Integrated Builders to manage construction of the Montvale Avenue project. The facility, designed by BL Cos., will offer 1,000 units. It’ll be built into the side of a hill and include retaining...
Update 6/4/19 – The joint venture led by The Natchez Group will open the second of two Nashville self-storage facilities with a ribbon-cutting event at 2 p.m. on June 11. SoBro Self Storage at 825 3rd Ave. S. comprises 19,088 square feet in 213...